Bridge Opening

Live image, 09/09/2024 16:55
}}

Current state of the bridge:

Closed

puente abajo

The bridge is scheduled to be raised from 17:00

Do you want to receive more information?

If you want to receive information when the status of the bridge is updated, tell us your email:

An infrastructure that channels the circulation of goods destined for port traffic between the Maliaño docks and the North Breakwater of Raos.